IPROCEL has executed the electromechanical assembly works of part of the total of the Núñez de Balboa photovoltaic plant, covering 200 MW of generation, located in the province of Badajoz (Spain). This facility, promoted by the Eiffage Group and developed in 2020, stands out for its scale and for having been a benchmark in the deployment of solar generation on the Iberian Peninsula.
The scope of work has included:
- Assembly of structures, photovoltaic panels and medium-voltage main equipment.
- Installation and connection of electrical and control systems.
- Integration of auxiliary equipment and protection systems.
- On-site technical coordination to ensure compliance with deadlines and quality standards.
This project represents one of the largest photovoltaic plants in which IPROCEL has had the opportunity to collaborate in Spain, consolidating its experience in the construction of large renewable installations and contributing to the sustainable development of the national energy system.