IPROCEL participated in the commissioning services of the Alcántara Hydroelectric Power Plant, located in the province of Cáceres, Spain. This plant, with an installed capacity of 230 MW, is a key part of the national electricity system.
The scope of work included:
- Supervision and performance of functional and operational tests on electrical and control systems.
- Verification of the integration and correct operation of the equipment with the existing infrastructure.
- Verification of compliance with technical and safety parameters according to regulations.
- Coordination with the client to ensure an efficient and stable start-up of the plant.
This project represents the largest hydroelectric power plant in which IPROCEL has participated, demonstrating its ability to meet major technical challenges in the power generation sector.